Koda Hydroelectric Project


Under the funding of USAID in a part of the word where infrastructure was abysmal, a consortium constructed a hydroelectric plant to provide electricity to local villages.


Quick Facts on Construction:



Koda Construction


  • Koda Project aerial view 

Koda Construction Video


“When the main switch was turned on, the automatic overload protection immediately tripped, probably due to the imbalance of the capacitive and inductive load. This happened two more times. The fourth time the switch held, and Dale Rash recorded the official time the power was turned on: 4:18 P.M. on October the 18 of 1988.”

Paul Brown
God’s Calling, pg. 266

  • Presentation of flowers to the Governor

Want to learn more about the construction at Koda?
Check out Part 3 of God’s Calling: Mungu Anaweza